Experimental activities and models validation are performed in the SEASTAR WT wind tunnel located in the Environmental Park (Torino). This infrastructure is characterised by a large test chamber (6Lx9Dx2,5H meters) with a wind speed range of 0-7 m/s.
The main experiemnatal activities are realted to:
References
Scaling procedure for designing accidental gas release experiment / Moscatello, Alberto; Uggenti, Anna Chiara; Iuso, Gaetano; D'Ambrosio, Domenic; Cafiero, Gioacchino; Gerboni, Raffaella; Carpignano, Andrea.. - In: ENGINEERING COMPUTATIONS. - ISSN 0264-4401. - ELETTRONICO. - (2020).
Wind tunnel: a versatile infrastructure for validating gas releases simulations / Gerboni, R.; Carpignano, A.; Gueccia, A.; Ledda, G.; Moscatello, A.; C Uggenti, A.. - ELETTRONICO. - (2020), pp. 99-100. ((Intervento presentato al convegno HYPOTHESIS XV HYdrogen POwer THeoretical and Engineering Solutions International Symposium nel June 3-5, 2020.
Scaling procedure for the design of a validation experiment on an accidental gas release / Uggenti, A. C.; Moscatello, A.; Iuso, G.; D’Ambrosio, D.; Cafiero, G.; Gerboni, R.; Carpignano, A.. - ELETTRONICO. - (2019). ((Intervento presentato al convegno CM4P – Computational Methods in Multi-Scale, Multi-Uncertainty and Multi-Physics Problems - ECCOMAS Thematic Conference tenutosi a Porto (Portugal) nel 15/07/2019-19/07/2019.